Index |
Abbreviation |
Description |
Category |
Mark |
3 |
3GPP |
3rd Generation Partnership Project |
HW |
The original scope of 3GPP was to produce globally applicable Technical Specifications and Technical Reports for a 3rd Generation Mobile System based on evolved GSM core networks and the radio access technologies that they support both Frequency Division Duplex (FDD) and Time Division Duplex (TDD) modes). http://www.3gpp.org/ |
A |
AC |
Architecture |
PM |
|
A |
APEMA |
Asia Pacific Middle East and Australia |
M&S |
It is one of marketing area used by Philips. |
A |
ART |
Accelerated Reliability Test |
MD |
|
A |
ASE |
Architecture & System Engineering |
CECW |
|
A |
AVL |
Approve Vendor List |
S&M |
|
B |
B&W |
Black & White. |
HW |
It is for LCD type, such as B/W, 4K color, 65K color etc. |
B |
BABT |
British Approvals Board of Telecommunication |
HW |
http://www.babt.com/ |
B |
BCA |
Business Case Analysis |
M&S |
|
B |
BER |
Bit Error Rate |
HW |
It is one of key RF parameter and test items online. |
B |
BOM |
Bill Of Material |
TOP |
|
C |
CAS Form |
Component Approval Submission Form |
QA |
It is for CECW ONLY. In Philips, CAS means Customer Approval Sample, which is expressed in qty. |
C |
CB |
Contract Book |
PM |
|
C |
CD |
Component Damage |
TOP |
Items of defect description, incoming material issue. |
C |
CDMA |
Code Division Multiple Access |
HW |
|
C |
CE |
Communaute Europeenne (French) |
HW |
It is French and used even by English literature now (means European community). CE mark/certification is necessary for mobile phone sales in European retail/operator channel, which include EMC, SAR and Safety. |
C |
CMCC |
China Mobile Communications Corporation |
ALL |
http://www.chinamobile.com/ |
C |
COB |
Chip On Board |
HW |
LCD IC bonding process, include COG, COF, TAB, COB, SMT etc |
C |
COF |
Chip On Film |
HW |
LCD IC bonding process, include COG, COF, TAB, COB, SMT etc |
C |
COG |
Chip On Glass |
HW |
LCD IC bonding process, include COG, COF, TAB, COB, SMT etc |
C |
CR |
Change Request |
M&S |
It is for CECW ONLY. In Cellon France, it is named CRF (Change Request Form) and there is a database of all CRF kept by key Account Manager. |
C |
CRR |
Component Review Report |
QA |
The document is to approve that a customized part can fully meet CECW's print/specification and component implied requirements. |
C |
CS |
Cold Solder |
TOP |
Items of defect description, SMT process issue. |
C |
CSN |
Concession |
ALL |
In agile, we use CSN to replace LSR. |
C |
CSTN |
Color Supertwist Nematic |
HW |
LCD technology |
C |
CTA |
China Type Approval |
HW |
|
D |
DAF |
Drawing/Specification Agreement Form |
QA |
|
D |
DCN |
Design Change Notice |
ALL |
Initially, DCN is the design change information before SA while ECO is the one after SA, which using in CECW ONLY. Now CECW have implemented Agile (PLM system) and unified DCN & ECO to ECO. Surely, some CECW old project still follow DCN now. |
D |
DDD |
Detail Design Document |
SW |
|
D |
DFM |
Design For Manufacture |
TOP |
|
D |
DOE |
Design of Experiment |
ALL |
Engineer Statistical method |
D |
DP |
Damage Part |
TOP |
Items of defect description. it is visual material issue caused by production instead of incoming. |
|